A2038210679 Master Power Window Switch with Long Lead

A2038210679 Master Power Window Switch with Long Lead

ABS master window control switch with four window buttons and a long wired connector for compatible Mercedes-

R 458.00

Takealot · checked 4 days ago

View at Takealot
Average
R 458.00
Lowest seen
R 458.00
Highest seen
R 458.00
Last change
R 0.00
First indexed
17 Nov 2026
Retailer
Takealot

Description

  • Master switch layout with four electric window control buttons.
  • Integrated boot release button on the separate control section.
  • Long lead and blue multi-pin connector design for matching vehicle wiring.
  • Black ABS housing offers a neat, vehicle-interior-ready finish.
  • Suitable for selected Mercedes-Benz vehicles; match the part number, connector and switch layout before ordering.

Product Description:
Replace a worn or unresponsive driver-side window control unit with this A2038210679 master power window switch. It features four window control buttons, a separate boot release control, black ABS construction and a long wired connector. Designed for use with compatible Mercedes-Benz vehicle applications, this replacement switch should be matched carefully against your existing part number, plug type and button configuration before purchase.

Usage Scenarios:
Ideal for replacing a damaged, worn or faulty driver-door master window switch where the vehicle uses a matching long-lead connector and control layout. Suitable for vehicle repair, maintenance and restoration work.

What's in the box
1 x A2038210679 Master Power Window Switch with Long Lead

Similar products