Dog long lead 10m, Black
10m fixed lead
R 430.00
4.5(15)
View at Takealot rated at Takealot ยท checked 3 days ago
- Average
- R 430.00
- Lowest seen
- R 430.00
- Highest seen
- R 430.00
- Last change
- R 0.00
- First indexed
- 02 Sep 2022
- Retailer
- Takealot
Description
For more off leash feeling, take your dog for walks on this fixed, strong 10m lead. For all breeds and sizes. Strong metal clip.
10m 25mm strap lead
Strong metal clip +/- 8cm
What's in the box
1x Black 10m Lead
Similar products
Takealot
5M Retractable Dog Leash - Long Durable Green Dog Lead
R 218.00
Takealot
2.1M Dog Leash Reflective Pet Rope Lead Fixed Dog Lead Rope Harness - Green
4.8(13)R 155.00
Takealot
10m Dog Long Lead Black, Fixed Pet Training Leash for Large Dogs & Cats
R 312.00

Vivifying
Vivifying Long Line Dog Lead, 10m/32ft Nylon Training Lead for Dogs Tracking Training Obedience Lead Leash (Black)
R 663.48
Takealot
Dog Long Leash 10m x 2cm Adjustable Training Lead for Large Dogs Red
R 200.00
Takealot
Dog Long Leash 10m x 2cm Adjustable Training Lead for Large Dogs Pink
R 202.00
Takealot
3 Piece Slip-Rope Dog Lead 1.4M Long - Black, Blue & Red Slip-On Rope Leash
R 224.00
MANYOO
MANYOO 5m/10m Reflective Long Dog Leash for Medium & Large Dogs, Metal Clip
4.7(3)R 209.00
Takealot
30M Long Nylon Dog Training Leash
R 380.00

Amazon
Plutus Pet Rope Dog Leash 6ft Long,Traffic Padded Two Handle,Heavy Duty,Reflective Double Handles Lead for Control Safety Training,Leashes for Large Dogs or Medium Dogs,Dual Handles Leads(Light Blue)
R 947.00

Vivifying
Vivifying 32 ft Black Dog Training Leash, Reflective Floating Check Cord
R 969.00
Takealot
Dog Leash / Lead - Heavy Duty, 1.8M/2.8M Long, Thick Rope, Padded Handle
3.4(12)R 191.00