
Herm Sprenger Rubberised Nylon Long Lead Neon Green Reflective (200cm)
R 2 096.00
3.5(12)
View at Amazon rated at Amazon ยท checked 6 days ago
- Average
- R 1 935.00
- Lowest seen
- R 1 935.00
- Highest seen
- R 2 096.00
- Last change
- R 161.00
- First indexed
- 23 Oct 2026
- Retailer
- Amazon
Description
The Herm Sprenger rubberised long lead is made of nylon woven neon green through with a durable black rubber thread and a reflective strip for visibility in low light conditions.
With a generous 17cm/16.5cm handle.
The resulting lead ensures the on the handle is soothing and safe even in wet or muddy conditions.
The rubberised nylon lead dimensions: 19mm wide and a choice of either 120cm / 119.4cm or 200cm / 200.7cm