
Waterproof Dog Training Leash 50FT 30FT 15FT 10FT 5FT Heavy Duty Recall Long Lead for Large Medium Small Dogs (50FT, Black)
rated at Amazon · checked 9 days ago
12 offers · 2 retailers
Listed under the same model number
No barcode ties these listings together, so no saving is claimed. See the listings
Matched by model number; no shared barcode
- Average
- R 873.10
- Lowest seen
- R 873.10
- Highest seen
- R 873.10
- Last change
- R 0.00
- First indexed
- 20 Nov 2026
- Retailer
- Amazon
- View
R 238.00
Takealot
Dog Deterrent Devices with HD Display - 3 Emitters, 50FT Range, FlashlightChecked Yesterday
ViewR 276.00
+R 38.00
- View
R 313.00
+R 75.00
Takealot
Ultrasonic Dog Control Device, up to 50Ft Range, Indoor/Outdoor Control1.0(2) Checked 3 days ago
ViewR 368.00
+R 130.00
- View
R 399.00
+R 161.00
- View
R 407.00
+R 169.00
- View
R 551.00
+R 313.00
Amazon This listing
Waterproof Dog Training Leash 50FT 30FT 15FT 10FT 5FT Heavy Duty Recall Long Lead for Large Medium Small Dogs (50FT, Black)
4.7(83) Checked 9 days ago
ViewR 873.10
+R 635.10
Amazon
Waterproof Long Leash Durable Dog Recall Training Lead Great for Outdoor Hiking, Training, Yard, Beach and Swimming (Yellow, 50ft)4.6(44) Checked Today
ViewR 1 293.00
+R 1 055.00
Amazon
Waterproof Dog Training Leash 50FT 30FT 15FT 10FT 5FT Heavy Duty Recall Long Lead for Large Medium Small Dogs (30FT, Orange)4.6(316) Checked 5 days ago
ViewR 1 442.00
+R 1 204.00
Amazon
50ft Roll 14 Gauge Heavy Duty Professional Grade Twisted Dog Fence Wire - Compatible with All Brands4.7(29) Checked Yesterday
ViewR 2 161.00
+R 1 923.00
Amazon
Cotton Dog Training Lead, 50ft, Red, Soft Woven Dog Training Leash for Obedience, Recall, and Control Training5.0(1) Checked Today
ViewR 2 391.00
+R 2 153.00
Each price is from PriceFind's last check of that retailer. Follow the link for the live price.
Description
Similar products

Fida
Fida Hands Free Dog Leash for Large Dogs Heavy Duty, Adjustable Crossbody/Waist Leash for Small/Medium/Large Dogs, Waterproof Hands-Free Dog Leashes for Running, Walking & Training(L, Black)
3.9(25)Takealot
Waterproof Dog Training Leash 6m - Navy Heavy-Duty Recall Lead - Navy
Takealot
Waterproof BioThane Dog Lead with Silver Hardware

Qiaosite
Waterproof Long Leash Durable Dog Recall Training Lead Great for Outdoor Hiking, Training, Yard, Beach and Swimming (Green, 15ft)
4.8(37)
Qiaosite
Waterproof Long Leash Durable Dog Recall Training Lead Great for Outdoor Hiking, Training, Yard, Beach and Swimming (Blue, 15ft)
4.7(69)Takealot
Dog Training Collar - 2000Ft Dog Training Collar with Remote -Black
Takealot
Dog Training Collar-3608FT Remote, Waterproof Electric|Rechargeable eCollar
4.0(15)Takealot
Rechargeable Waterproof Dog Training Collar with Remote - 3 Training Modes
Takealot
Dog Collar Waterproof Rechargeable Collar for Effective Pet Training
Takealot
Dog Training Collar, 3 Training Modes, Rechargeable Shock Collar for Dogs
5.0(2)Takealot
Dog Bark Collar Smart Anti Bark Collar Rechargeable Waterproof
Takealot