Dog long lead 7m, black
7m fixed lead
R 350.00
4.3(18)
View at Takealot rated at Takealot · checked Yesterday
- Average
- R 335.00
- Lowest seen
- R 320.00
- Highest seen
- R 350.00
- Last change
- -R 30.00
- First indexed
- 27 Jul 2022
- Retailer
- Takealot
Description
For more off leash feeling, take your dog for walks on this fixed, strong 7m lead. For all breeds and sizes. Strong metal clip.
7m 25mm strap lead
Strong metal clip +/- 8cm
What's in the box
1x Black 7m Lead
Similar products
Takealot
5M Retractable Dog Leash - Long Durable Green Dog Lead
R 218.00

Vivifying
Vivifying Long Line Dog Lead, 10m/32ft Nylon Training Lead for Dogs Tracking Training Obedience Lead Leash (Black)
R 819.82
Chill Out
Dog Long Lead - 3m - Black
4.5(19)R 180.00
Chill Out
Dog long lead 10m, Black
4.3(16)R 430.00
Takealot
10m Dog Long Lead Black, Fixed Pet Training Leash for Large Dogs & Cats
R 230.00
Yowie
Yowie – Dog Leash / Lead – Heavy Duty, 1.8M Long, Thick Rope, Padded Handle
4.6(80)R 139.00R 166.63
Takealot
3 Piece Slip-Rope Dog Lead 1.4M Long - Black, Blue & Red Slip-On Rope Leash
R 224.00
MANYOO
MANYOO 5m/10m Reflective Long Dog Leash for Medium & Large Dogs, Metal Clip
4.7(3)R 209.00
Takealot
30M Long Nylon Dog Training Leash
R 325.00

PLUTUS PET
Plutus Pet Rope Dog Leash 6ft Long,Traffic Padded Two Handle,Heavy Duty,Reflective Double Handles Lead for Control Safety Training,Leashes for Large Dogs or Medium Dogs,Dual Handles Leads(Light Blue)
R 891.00

Vivifying
Vivifying 32 ft Black Dog Training Leash, Reflective Floating Check Cord
R 1 014.00
Takealot
Dog Leash / Lead - Heavy Duty, 1.8M/2.8M Long, Thick Rope, Padded Handle
3.4(12)R 121.00R 194.52